{"id":141,"date":"2022-06-26T12:46:06","date_gmt":"2022-06-26T10:46:06","guid":{"rendered":"https:\/\/echoeg.com\/?p=141"},"modified":"2022-07-08T12:16:46","modified_gmt":"2022-07-08T10:16:46","slug":"audyt-energetyczny-przedsiebiorstwa","status":"publish","type":"post","link":"https:\/\/echoeg.com\/en\/audyt-energetyczny-przedsiebiorstwa\/","title":{"rendered":"Company Energy Audits"},"content":{"rendered":"<p><strong>Obligatory Company Energy Audit<\/strong> (EED) is carried out in accordance with the Energy Efficiency Act according to the methodology contained in the PN- EN 16247 standard. Company Energy Audit provides a detailed overview of the energy consumption of buildings or building complexes, industrial installations and transport, which together account for at least 90% of the company \u2018s total energy consumption.<\/p>\n\n\n\n<p><strong>The purpose of the Company\u2019s Energy audit is:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Fulfillment of the legal obligation to perform an audit every 4 years<br>and informing the URE about the results of the audit;<\/li><li>Obtaining information on the amount of energy consumption and areas of energy use<br>in the company;<\/li><li>Identification of possible energy savings;<\/li><li>Indication of areas for improving the energy effciency of the organization;<\/li><\/ul>\n\n\n\n<p><br><strong>When it concerns:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Every large entrepreneur within the meaning of <em>the Entrepreneurs Act<\/em>,<br>with the exception of micro, small or medium-sized entrepreneurs \u2013 after checking the financial and employment criteria for the last two financial years, every large entrepreneur must conduct an energy audit of the enterprise every 4 years;<\/li><li>Any new entrepreneur who will meet the criteria described above;<\/li><li>If your company wants to achieve savings in energy consumption;<\/li><\/ul>\n\n\n\n<p><br><strong>Procedure of the EDD Audit:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><img decoding=\"async\" alt=\"\" src=\"https:\/\/moj-projekt.pl\/echo-cms\/admin\/ckeditor\/kcfinder\/upload\/images\/zakres.jpg\"><\/td><td>Audit planning, data collection and field work.<\/td><\/tr><tr><td><img decoding=\"async\" alt=\"\" src=\"https:\/\/moj-projekt.pl\/echo-cms\/admin\/ckeditor\/kcfinder\/upload\/images\/wniosek.png\"><\/td><td>Detailed analysis of energy consumption, study of technological processes<br>and auxiliary installations, analysis of buildings and transport in terms of energy savings along with the identification of areas of significant losses.<\/td><\/tr><tr><td><img decoding=\"async\" alt=\"\" src=\"https:\/\/moj-projekt.pl\/echo-cms\/admin\/ckeditor\/kcfinder\/upload\/images\/decyzja.png\"><\/td><td>Preparation of a report with the specification of possible energy savings and list of activities as a result of which energy efficiency is increased.<\/td><\/tr><tr><td><img decoding=\"async\" src=\"https:\/\/moj-projekt.pl\/echo-cms\/admin\/ckeditor\/kcfinder\/upload\/images\/zlozenie.jpg\" alt=\"\"><\/td><td>Notification of the Chairman of the Energy Regulatory Office (ERA) about the conducted audit, within 30 days of its completion.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>ATTENTION:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>There is heavy penalty for not performing the audit. Pursuant to the provisions of the Energy Efficiency Act, the fine may amount to 5% of the turnover achieved by the entrepreneur in the previous tax year.<\/li><li>When you will be released from the obligation to conduct an energy audit of the company:<ul><li>if you do not want to carry out energy audits of the company every 4 years, we can help you implement an energy management system compliant with ISO 50001 standard<\/li><li>or we can help you implement the EMAS environmental management system (Article 2 pt. 13 of Regulation (EC) No. 1221\/2009 of the European Parliament and of the Council of 25 November 2009)<\/li><\/ul><\/li><\/ul>\n\n\n\n<p>In both of th above cases, the condition for compliance with the law is to conduct an energy audit of the company under ISO 50001 or EMAS and to notify the Chairman of the Energy Regulatory Office (ERA) about the results in the field of energy efficiency.<\/p>\n\n\n\n<p>Our auditors have performed dozens of Company\u2019s Energy Audits and have experience in advising enterprises in this area. If you want, we can combine the Company\u2019s Energy Audit with an audit identifying potential projects qualifying for energy efficiency audits, thanks to which entrepreneurs can obtain additional financing in the form of the so-called white certificates<\/p>","protected":false},"excerpt":{"rendered":"<p>Obowi\u0105zkowy audyt energetyczny przedsi\u0119biorstwa (AEP) przeprowadzany jest zgodnie z Ustaw\u0105 o efektywno\u015bci energetycznej wed\u0142ug metodyki zawartej w normie PN- EN 16247. Audyt energetyczny przedsi\u0119biorstwa zawiera szczeg\u00f3\u0142owy przegl\u0105d zu\u017cycia energii w budynkach lub zespo\u0142ach budynk\u00f3w, w instalacjach przemys\u0142owych oraz transporcie, odpowiadaj\u0105cych \u0142\u0105cznie za co najmniej 90% ca\u0142kowitego zu\u017cycia energii przez dane przedsi\u0119biorstwo. Celem audytu energetycznego przedsi\u0119biorstwa [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-141","post","type-post","status-publish","format-standard","hentry","category-energia"],"acf":[],"featured_image_src":null,"author_info":{"display_name":"admin","author_link":"https:\/\/echoeg.com\/en\/author\/admin\/"},"_links":{"self":[{"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/posts\/141","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/comments?post=141"}],"version-history":[{"count":7,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/posts\/141\/revisions"}],"predecessor-version":[{"id":363,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/posts\/141\/revisions\/363"}],"wp:attachment":[{"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/media?parent=141"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/categories?post=141"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/tags?post=141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}