{"id":125,"date":"2022-06-26T12:44:09","date_gmt":"2022-06-26T10:44:09","guid":{"rendered":"https:\/\/echoeg.com\/?p=125"},"modified":"2026-06-18T13:09:32","modified_gmt":"2026-06-18T11:09:32","slug":"gleba-i-odpady","status":"publish","type":"post","link":"https:\/\/echoeg.com\/en\/gleba-i-odpady\/","title":{"rendered":"Waste"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>Our team also conducts comprehensive calculations and acoustic analyzes in the procedure of obtaining environmental decisions or for the needs of changing an integrated permit for various installations and investments. Our experts work in the IMMI program, which is a universal tool for creating professional acoustic maps. We carry out analyzes and calculations of road, rail and industrial noise.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What kind of permits are we dealing with in the waste area:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>permit to collect waste;<\/li>\n\n\n\n<li>permission to process waste;<\/li>\n\n\n\n<li>permission to collect and process waste;<\/li>\n\n\n\n<li>a permit for the generation of waste, taking into account the collection and processing of waste.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>When do you need to obtain a permit:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>if you produce non-hazardous waste with a mass exceeding 5,000 Mg per year;<\/li>\n\n\n\n<li>if you produce hazardous waste weighing more than 1 Mg per year;<\/li>\n\n\n\n<li>if you collect waste (remember about exceptions, eg: having a waste collection permit does not apply to: collecting medicines and their packaging by pharmacies, waste generated by their producer, if they are collected at the place where they are generated );<\/li>\n\n\n\n<li>if you process waste, i.e. the activity consists in recovering secondary raw materials in production processes (so-called recycling) or neutralizing waste in technical installations (e.g. by incineration or by appropriate storage).<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><br><strong>Procedure for obtaining a permit:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/echoeg.com\/wp-content\/uploads\/2022\/06\/ChatGPT-Image-18-cze-2026-13_08_30-1024x576.png\" alt=\"\" class=\"wp-image-1411\" srcset=\"https:\/\/echoeg.com\/wp-content\/uploads\/2022\/06\/ChatGPT-Image-18-cze-2026-13_08_30-1024x576.png 1024w, https:\/\/echoeg.com\/wp-content\/uploads\/2022\/06\/ChatGPT-Image-18-cze-2026-13_08_30-300x169.png 300w, https:\/\/echoeg.com\/wp-content\/uploads\/2022\/06\/ChatGPT-Image-18-cze-2026-13_08_30-768x432.png 768w, https:\/\/echoeg.com\/wp-content\/uploads\/2022\/06\/ChatGPT-Image-18-cze-2026-13_08_30-1536x864.png 1536w, https:\/\/echoeg.com\/wp-content\/uploads\/2022\/06\/ChatGPT-Image-18-cze-2026-13_08_30-18x10.png 18w, https:\/\/echoeg.com\/wp-content\/uploads\/2022\/06\/ChatGPT-Image-18-cze-2026-13_08_30.png 1672w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><br><strong>Remember:<\/strong>&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the application should be submitted at least 2 months before the intended date of commencement of business;<\/li>\n\n\n\n<li>za prowadzenie dzia\u0142alno\u015bci polegaj\u0105cej na zbieraniu odpad\u00f3w, przetwarzaniu odpad\u00f3w bez wymaganego zezwolenia grozi kara administracyjna\u00a0w wysoko\u015bci od 10 000 z\u0142 do 1\u00a0000 000 z\u0142;<\/li>\n\n\n\n<li>the application for waste collection, waste processing must be accompanied by a fire inspection report, which includes the conditions of fire protection of the installation, facility or part thereof or other waste storage place, agreed with the poviat (municipal) commander of the State Fire Service;<\/li>\n\n\n\n<li>depending on the type of investment, the office may also require a decision on environmental conditions to be attached to the application<\/li>\n\n\n\n<li>The operation of an installation for which the required\u00a0<strong>integrated permit<\/strong>\u00a0has not been obtained may be suspended by the competent voivodeship environmental protection inspector;<\/li>\n\n\n\n<li>Additionally, the operation of the installation without the required\u00a0<strong>integrated permit<\/strong>\u00a0podlega\u00a0karze\u00a0aresztu albo ograniczenia wolno\u015bci, albo grzywny.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Our team of specialists with appropriate knowledge and professional experience is involved in the permit obtaining procedure, which guarantees high quality documentation and project management aimed at minimizing the time needed to obtain a decision.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We prepare the necessary documentation, obtain all necessary arrangements, represent clients before public administration bodies and participate in the entire administrative procedure.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Our team also conducts the procedure of issuing or changing integrated permits (IPPC).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We can also assist in the procedure of recognizing an object or substance as a by-product that is not waste for an object or substance resulting from a production process whose primary purpose is not their production.<\/p>","protected":false},"excerpt":{"rendered":"<p>Wprowadzenie ustawy Prawo Ochrony \u015arodowiska na\u0142o\u017cy\u0142o na firmy i inne podmioty szereg obowi\u0105zk\u00f3w maj\u0105cych na celu usankcjonowanie korzystania z r\u00f3\u017cnych element\u00f3w \u015brodowiska. Jednym z nich jest&nbsp;obowi\u0105zek uzyskania pozwolenia na wytwarzanie odpad\u00f3w, kt\u00f3re powstaj\u0105 w zwi\u0105zku z eksploatacj\u0105 instalacji oraz posiadanie pozwolenia na zbieranie i transport odpad\u00f3w. Z jakimi pozwoleniem mamy do czynienia w obszarze odpad\u00f3w: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[8],"tags":[],"class_list":["post-125","post","type-post","status-publish","format-standard","hentry","category-ochrona-srodowiska-i-audyty"],"acf":[],"featured_image_src":null,"author_info":{"display_name":"admin","author_link":"https:\/\/echoeg.com\/en\/author\/admin\/"},"_links":{"self":[{"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/posts\/125","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/comments?post=125"}],"version-history":[{"count":11,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/posts\/125\/revisions"}],"predecessor-version":[{"id":1412,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/posts\/125\/revisions\/1412"}],"wp:attachment":[{"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/media?parent=125"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/categories?post=125"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/echoeg.com\/en\/wp-json\/wp\/v2\/tags?post=125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}